Project references |
| |
|
|
|
|
Hotel & Resort |
| |
|
|
★★★★★ |
|
Millenium Hilton Hotel (Klong San) |
2005-2006 |
- HVAC-R >> Centrifugal Chiller "Trane" @650TR = 3 |
- Fire Protection >> Engine FP & EFP cap.1,000gpm = 2 |
- Sanitary and Plumbing |
- Heat Pump @50KW = 4 Sets , HWST 12,000L = 2 | |
|
• Testing and Commissioning |
|
★ Contract Value (Bahts) |
24,000,000 | | |
|
|
★★★★★ |
|
Sheraton Hotel & Resort , Hua Hin |
2006-2007 |
- HVAC-R |
- Fire Protection |
- Sanitary and Plumbing | |
|
• Testing and Commissioning |
|
★ Contract Value (Bahts) |
40,000,000 | | |
|
|
★★★★ |
|
Millenium Hilton Hotel (Patong Beach Phuket) |
2006-2007 |
- HVAC-R |
- Fire Protection |
- Sanitary and Plumbing | |
|
• Testing and Commissioning |
|
★ Contract Value (Bahts) |
34,000,000 | | |
|
|
★★★★ |
|
Park Village (Rama-2) |
2010-2011 |
- HVAC-R >> VRF "LG" |
- Fire Protection >> Engine FP cap.1,000gpm = 1 |
- Sanitary and Plumbing | |
|
• Testing and Commissioning |
|
★ Contract Value (Bahts) |
45,000,000 | | |
|
|
★★★★★★ |
|
Siam Kempinski Hotel |
2009-2010 |
|
|
- HVAC-R >> Centrifugal Chiller "York" @800TR = 4 |
- Fire Protection >> Engine FP & EFP cap.1,000gpm = 2 |
- Sanitary and Plumbing |
- Heat Pump @65KW = 6 Sets , HWST 5,000L = 4 | |
• Testing and Commissioning |
|
★ Contract Value (Bahts) |
72,000,000 | | |
|
|
★★★★★ |
|
Hilton Hotel , Sukhumvit Soi 24 |
Jan-Dec 2012 |
|
|
- HVAC-R >> Screw Chiller "Trane" @350TR = 3Sets |
- Fire Protection >> Engine Fire Pump ,Cap.
1,500 gpm |
- Sanitary and Plumbing |
- Heat Pump @100KW = 4 Sets , HWST 12,000L = 2 |
- Waste water treatment >> Intermittent Decanted
Extended Areation (IDEA) = 2 Sets | |
• Testing and Commissioning |
|
• Turn Key Re-design and Variable
Engineering (VE) |
22,000,000 |
★ Contract Value (Bahts) |
140,000,000 | | |
|
|
|
|
The River Codominium(Tower A - 71Floor) |
2010-2012 |
• Deluxe 510 Units |
|
• Penhouse 4 Units |
|
• Testing and Commissioning |
|
★ Contract Value (Bahts) |
120,000,000 | | |
| |
|
|
|